6,000+ ft. Run in 24 Hrs. in West Texas

6,000+ ft. Run in 24 Hrs. in West Texas

In Culberson County, Texas, utilizing the PowerDrive Orbit Rotary Steerable System, Legacy Directional drilled an impressive 6 1/8” hole with 6,134 feet in just 24 hours. The run’s distance spanned 10,311 feet in 31 hours, completing the VCL. With ROP averaging 326...
New Milestone: 6,220 feet in 24 Hours

New Milestone: 6,220 feet in 24 Hours

HOUSTON, TX, April 2, 2025 / Legacy Directional Drilling, in partnership with operator Permian Deep Rock, achieved an impressive milestone in the Midland Basin with Rig Akita 801. Using rotary steerable systems and water-based fluid from Relevant Drilling Fluids, the...
Legacy Directional Drills Record Breaking Austin Chalk Well

Legacy Directional Drills Record Breaking Austin Chalk Well

Using Legacy Motors, our team drilled a 20,000+ ft. Austin Chalk well in Webb County, TX withstanding temperatures reaching as high as 340°F. With our enhanced motor technology and drilling expertise, the well took just 13 days to complete, from spud to total depth...
Skip to content